4M TPA Dolomite Sand and Gravel Production Line   Project Description This project adopts the complete set of mining equipment from Zhongyu Dingli and is equipped with an intelligent unmanned mining production system. It has a designed annual output of 4 million tons, including 3.2 million tons of manufactured stone and 800,000 tons of manufactured sand per annum. The products are classified into 10 specifications in total – refined materials (0-3mm, 3-5mm, 5-10mm, 10-15mm, 15-20mm, 20-25mm, 25-31.5mm) and general materials (0-5mm, 5-10mm, 10-15mm).   Project Overview Project Location: Jiujiang City, Jiangxi Province Processing Materials: Calcite, Dolomite Production Capacity: 4 Million Tons Per Annum (4M TPA) Project Requirements: 0-3mm, 3-5mm, 5-10mm, 10-15mm, 15-20mm, 20-25mm, 25-31.5mm   Case Site   Configuration Process Project Features   Processing Technology:   Raw Material Loading & Transportation:Limestone ore is loaded by excavators and loaders, then transported…

A Video Interactive Platform For Global Opportunities

Copyrights © 2026 aeco-pi.com All Rights.Reserved .